“Memory and Identity” Museum Building Named After John Paul II in Toruń
Object
Construction of the “Memory and Identity” Museum Headquarters Named After John Paul II in Toruń
Scope
Electrical engineering investor supervision (1500 kW): Supervision of electrical and low‑voltage installations (BMS, fire alarm system, CCTV, LAN, intrusion detection, access control, nurse call systems, and stage technology) with a connection capacity of 1,500 kW.
Date
2019 – 2021

